
EllaLink, which is building a four-pair subsea cable between Portugal and Brazil, will deploy smart sensor on its cable to provide the scientific community with real-time, accurate and relevant data on seabed conditions. This will make EllaLink the first commercial subsea telecom cable system to integrate SMART cable concepts.
The EllaLink GeoLab infrastructure, which will be provided by EllaLink in cooperation with EMACOM, will leverage distributed...