Showing posts with label Ellalink. Show all posts
Showing posts with label Ellalink. Show all posts

Wednesday, October 19, 2022

EllaLink plans petabit cable along Portugal's coast

EllaLink, which operates a subsea cable directly connecting Europe to Latin America, plans to build a direct connection between Sines and the Lisbon Metro Area via a new subsea cable.

The multi-petabit capacity "Olisipo" system will connect all the international submarine landings in Portugal with the major data centers in the region, including the data centers of Start Campus NEST in Sines and Altice LDV in Lisbon. The cable will land in Carcavelos and Sines and will be ready to branch into Seixal & Sesimbra cable landing stations and connect the Setubal area.

The unrepeatered, 110km fully buried cable will incorporate 288 fibers, providing a design capacity of 4.3 Petabits. The cable robustness will be enforced by particular care given to route engineering with special attention to cable crossing, full subsea and terrestrial burial strategy, full cable armouring and extra shore-end protection with bore pipe in Sines.

The Olisipo system will provide direct POP to POP connectivity at fibre pair level between the main Data Centres located in Sines and Lisbon Metro Area, connecting at day one 

https://ella.link/2022/10/18/olisipo-the-new-ellalink-cable-petabits/

EllaLink opens PoP with Brazil's GlobeNet

EllaLink announced a new PoP with GlobeNet in Fortaleza, Brazil. Brazilian customers of GlobeNet will be able to use the EllaLink cable - which stretches 6,000 km between Fortaleza (Ceará) and Sines (Portugal) - to access service content providers and Internet Exchange Points (IXs) in Europe. Similarly, European companies will be able to use the EllaLink cable to access GlobeNet's network.GlobeNet offers direct low-latency routes and advanced...

EllaLink cites 30% less latency for gamers on transatlantic link

EllaLink said its new fiber optic submarine cable linking Europe with Latin America enables gamers on both continents to play online matches with 30% less latency. EllaLink has entered into a partnership with IP Telecom - which provides differentiated IP transit access to the main content servers spread across the European continent - and with NoPing, a high-performance solution for latency improvement focused on the online gaming segment.Inaugurated...



Saturday, April 30, 2022

EllaLink opens PoP with Brazil's GlobeNet

EllaLink announced a new PoP with GlobeNet in Fortaleza, Brazil. 

Brazilian customers of GlobeNet will be able to use the EllaLink cable - which stretches 6,000 km between Fortaleza (Ceará) and Sines (Portugal) - to access service content providers and Internet Exchange Points (IXs) in Europe. Similarly, European companies will be able to use the EllaLink cable to access GlobeNet's network.

GlobeNet offers direct low-latency routes and advanced IT infrastructure in its CLSs and data centers in Brazil. It also operates a submarine cable network that covers more than 26.000 km, passing through Argentina, Brazil, Colombia, Bermuda, Venezuela and the USA.


EllaLink cites 30% less latency for gamers on transatlantic link

EllaLink said its new fiber optic submarine cable linking Europe with Latin America enables gamers on both continents to play online matches with 30% less latency. EllaLink has entered into a partnership with IP Telecom - which provides differentiated IP transit access to the main content servers spread across the European continent - and with NoPing, a high-performance solution for latency improvement focused on the online gaming segment.Inaugurated...

EllaLink and Equinix see big performance gain on Brazil-to-Europe route

 Equinix and Ellalink, which recently inaugurated service on its high-capacity cable between Latin America and Europe, report that the new system is delivering a 50% increase in network performance between data centers in Brazil and Portugal and Spain when compared to routes that had to previously transit through North America. EllaLink's subsea cable system provides direct connectivity to Equinix’s International Business Exchange (IBX)...

Tuesday, February 8, 2022

EllaLink cites 30% less latency for gamers on transatlantic link

EllaLink said its new fiber optic submarine cable linking Europe with Latin America enables gamers on both continents to play online matches with 30% less latency. 

EllaLink has entered into a partnership with IP Telecom - which provides differentiated IP transit access to the main content servers spread across the European continent - and with NoPing, a high-performance solution for latency improvement focused on the online gaming segment.

Inaugurated in June, after a BRL 1 billion investment, the EllaLink cable has four pairs of optical fibers, linking Fortaleza (Ceará) and Sines (Portugal), a distance of 6,000 km.

"This reduction in latency in the connection between Brazil and Europe, counted in milliseconds (ms), represents the biggest differential of our cable, but many people could not realize this gain in most applications," explains Rafael Lozano, EllaLink's Brazil manager. "In an online game, if we imagine two players, a Brazilian and a North American, playing on a European server, aiming at the same target at the same time, the differentiator between winning and losing will be who hits it first, and this is determined by latency, called LAG by gamers," he adds. According to Lozano, with this new route, they will compete on an equal footing.

Lozano notes that until the partnership between EllaLink, IP Telecom and NoPing, latencies across continents were around 250ms between major game servers, and a gaming experience considered good should be below 150 ms. "With the EllaLink cable, this latency reduces to less than 120 ms between points of high traffic concentration in Europe," he says.

"IP Telecom has in its DNA the search for state-of-the-art connectivity. We are creating a watershed in Latin America by offering the lowest latency between Brazil and Europe. This provides the market with a new experience," said IP Telecom's CEO, Jefferson Carvalho.

"This is just the beginning. EllaLink will connect a DataCenter in Cape Verde soon, which should impact on the increase of intercontinental play of popular online games. Then we will have a wave of African gamers joining the circuit," predicts Vasconcelos.

EllaLink and Equinix see big performance gain on Brazil-to-Europe route

 Equinix and Ellalink, which recently inaugurated service on its high-capacity cable between Latin America and Europe, report that the new system is delivering a 50% increase in network performance between data centers in Brazil and Portugal and Spain when compared to routes that had to previously transit through North America. EllaLink's subsea cable system provides direct connectivity to Equinix’s International Business Exchange (IBX)...

NEC's Optical Sensing measures vibrations in fiber cables

NEC has begun commercial sales of a new AI-driven technology that analyzes small vibrations detected with optical fibers.The "NEC Intelligent Optical Fiber Sensing Solution" enables the operator of fiber cables to utilize optical fiber as a sensor. The detected vibrations can be indicative of fiber damage or environmental shaking. In addition to a sensing device attached to one end of the optical fiber, this solution consists of software with a function...

EllaLink completes Portugal-Brazil cable, picks Infinera's ICE6 coherent tech

EllaLink completed the marine installation of its trans-Atlantic cable system between Europe and Latin America.EllaLink has selected Infinera's ICE6 800G coherent technology to light the network, providing a direct single hop transmission path between data centers in each continent. Infinera’s solution will enable EllaLink to offer advanced customer products and services, supporting over 100 Tbps between Portugal and Brazil. Furthermore, the network...

EllaLink's transatlantic cable to deploy acoustic sensor tech

EllaLink, which is building a four-pair subsea cable between Portugal and Brazil, will deploy smart sensor on its cable to provide the scientific community with real-time, accurate and relevant data on seabed conditions. This will make EllaLink the first commercial subsea telecom cable system to integrate SMART cable concepts. The EllaLink GeoLab infrastructure, which will be provided by EllaLink in cooperation with EMACOM, will leverage distributed...

New Atlantic Data Center Hub planned in Portugal

The EllaLink Group and aicep Global Parques – Gestão de Áreas Empresariais e Serviços, unveiled plans for a new "Sines Tech – Innovation & Data Center Hub" in Portugal. The new campus is to be built in the Portuguese port city of Sines, in proximity to the landing station for the new Ellalink subsea cable to Latin America. Diego Matas, Chief Operating Officer of EllaLink, added “I am delighted to announce our collaboration with Global Parks...



Sunday, November 28, 2021

EllaLink and Equinix see big performance gain on Brazil-to-Europe route

 Equinix and Ellalink, which recently inaugurated service on its high-capacity cable between Latin America and Europe, report that the new system is delivering a 50% increase in network performance between data centers in Brazil and Portugal and Spain when compared to routes that had to previously transit through North America. 

EllaLink's subsea cable system provides direct connectivity to Equinix’s International Business Exchange (IBX) data centers—SP4 in São Paulo, and LS1 in Lisbon and MD2 in Madrid.

Equinix says subsea cable momentum is rising on its global data center platform. 

According to the 5th annual Equinix Global Interconnection Index (GXI Vol. 5), overall interconnection bandwidth, the measure of private connectivity for the transfer of data between organizations, is forecast to reach 21,485+ Gbps, or 85 zettabytes, per year by 2024, representing a five-year compound annual growth rate (CAGR) of 44%. 

Diego Matas, Chief Operating Officer, EllaLink, states: "Offering one-hop connections between Latin America and Europe with a 60ms latency is a game changer from a transatlantic latency perspective. During this last months, EllaLink continued working directly with Equinix in order to secure carrier-neutral connections from our PoP locations in Equinix’s data centers and we are now enabling our customers to directly access the rich ecosystems of networks, clouds, and financial and IT service providers that Equinix hosts.”

Jim Poole, Vice President, Business Development, Equinix, states: “More data is being produced and processed today than ever before—and almost every byte of data that moves over the internet touches a subsea cable. As a result, organizations require access to high-capacity, low-latency networks capable of connecting them to data centers across oceans with the highest levels of reliability. This is where Equinix plays a critical role and offers a huge advantage to customers. Any user of a subsea cable network that lands inside one of our global data center termination points has instant, low-latency access to a host of industry ecosystems inside Equinix.”

https://www.equinix.com/newsroom/press-releases/2021/11/ellalink-collaborates-with-equinix-on-first-ever-high-capacity-subsea-cable-between-latin-america-and-europe

EllaLink completes Portugal-Brazil cable, picks Infinera's ICE6 

EllaLink completed the marine installation of its trans-Atlantic cable system between Europe and Latin America.EllaLink has selected Infinera's ICE6 800G coherent technology to light the network, providing a direct single hop transmission path between data centers in each continent. Infinera’s solution will enable EllaLink to offer advanced customer products and services, supporting over 100 Tbps between Portugal and Brazil. Furthermore, the network...

EllaLink's transatlantic cable to deploy acoustic sensor tech

EllaLink, which is building a four-pair subsea cable between Portugal and Brazil, will deploy smart sensor on its cable to provide the scientific community with real-time, accurate and relevant data on seabed conditions. This will make EllaLink the first commercial subsea telecom cable system to integrate SMART cable concepts. The EllaLink GeoLab infrastructure, which will be provided by EllaLink in cooperation with EMACOM, will leverage distributed...

New Atlantic Data Center Hub planned in Portugal

The EllaLink Group and aicep Global Parques – Gestão de Áreas Empresariais e Serviços, unveiled plans for a new "Sines Tech – Innovation & Data Center Hub" in Portugal. The new campus is to be built in the Portuguese port city of Sines, in proximity to the landing station for the new Ellalink subsea cable to Latin America. Diego Matas, Chief Operating Officer of EllaLink, added “I am delighted to announce our collaboration with Global Parks...

EllaLink and Telxius collaborate on Brazil-Portugal subsea cable

The EllaLink Group and Telxius signed a collaboration agreement for international subsea capacity and terrestrial connectivity in Latin America, including cable landing facilities in Fortaleza, Brazil. The complementary infrastructure owned by EllaLink and Telxius will enable European traffic to reach Rio de Janeiro, São Paulo and other key cities in Brazil and across Latin America. EllaLink is an open state-of-the-art 4 fiber pair submarine cable...


Thursday, March 11, 2021

EllaLink completes Portugal-Brazil cable, picks Infinera's ICE6 coherent tech

EllaLink completed the marine installation of its trans-Atlantic cable system between Europe and Latin America.

EllaLink has selected Infinera's ICE6 800G coherent technology to light the network, providing a direct single hop transmission path between data centers in each continent. Infinera’s solution will enable EllaLink to offer advanced customer products and services, supporting over 100 Tbps between Portugal and Brazil. Furthermore, the network will support a 30-Tbps link from Portugal to Madeira, with an additional 40-Tbps path between Portugal and Morocco in the future.

Ellalink will use Infinera’s GX Series Compact Modular Platform to provide its customers with low-latency services in a single hop between endpoints. EllaLink also plans to use ICE6 to bolster the capacity on its long-haul terrestrial network between Sines, Lisbon, Madrid, and Marseille. Future network expansions will enable EllaLink to extend its submarine network to French Guiana, Mauritania, the Canary Islands, and Morocco, resulting in the most advanced submarine system connecting Africa, Europe, and Latin America.

Infinera also highlighted the unique innovations in Infinera’s ICE6 technology, such as long-codeword probabilistic constellation shaping (LC-PCS) and intelligent power management. 

“I am proud to announce that we have successfully completed the 6,000 km submarine cable installation, providing EllaLink with the robust system it needs to support the network through its lifetime. Infinera’s ICE6 solution is an ideal fit for us, outperforming other available 800G equipment. Coupled with our differentiated fiber routes, Infinera and ICE6 will provide us the means to offer our customers advanced products and services from day one, in May 2021,” said Diego Matas, Chief Operations Officer at EllaLink.

“Deploying Infinera’s 800G solution on EllaLink’s new network will provide a superior networking experience to their customers when connecting between Europe and Latin America,” said Nick Walden, Senior Vice President, Worldwide Sales, Infinera. “Infinera’s open optical solution will enable EllaLink to offer new and differentiated services, helping to ensure their customers receive the highest level of service.”

https://www.infinera.com/press-release/ellalink-completes-marine-installation-and-turns-to-infinera-for-network-lighting

https://ella.link

EllaLink's transatlantic cable to deploy acoustic sensor tech

EllaLink, which is building a four-pair subsea cable between Portugal and Brazil, will deploy smart sensors on its cable to provide the scientific community with real-time, accurate and relevant data on seabed conditions. This will make EllaLink the first commercial subsea telecom cable system to integrate SMART cable concepts. The EllaLink GeoLab infrastructure, which will be provided by EllaLink in cooperation with EMACOM, will leverage distributed...

EllaLink and Telxius collaborate on Brazil-Portugal subsea cable

The EllaLink Group and Telxius signed a collaboration agreement for international subsea capacity and terrestrial connectivity in Latin America, including cable landing facilities in Fortaleza, Brazil. The complementary infrastructure owned by EllaLink and Telxius will enable European traffic to reach Rio de Janeiro, São Paulo and other key cities in Brazil and across Latin America. EllaLink is an open state-of-the-art 4 fiber pair submarine cable...

New Atlantic Data Center Hub planned in Portugal

The EllaLink Group and aicep Global Parques – Gestão de Áreas Empresariais e Serviços, unveiled plans for a new "Sines Tech – Innovation & Data Center Hub" in Portugal. The new campus is to be built in the Portuguese port city of Sines, in proximity to the landing station for the new Ellalink subsea cable to Latin America. Diego Matas, Chief Operating Officer of EllaLink, added “I am delighted to announce our collaboration with Global Parks...


Monday, June 29, 2020

EllaLink's transatlantic cable to deploy acoustic sensor tech

EllaLink, which is building a four-pair subsea cable between Portugal and Brazil, will deploy smart sensor on its cable to provide the scientific community with real-time, accurate and relevant data on seabed conditions. This will make EllaLink the first commercial subsea telecom cable system to integrate SMART cable concepts.

The EllaLink GeoLab infrastructure, which will be provided by EllaLink in cooperation with EMACOM, will leverage distributed acoustic sensing (DAS) technology in the Madeira branch of the subsea cable system. It will collect data along the route which will be optically transmitted back to the shore, independently and without impacting either telecoms traffic or the design life of the cable.

EllaLink is collaborating with GÉANT and the Portuguese NREN, FCT, both members of the BELLA Consortium, who will use EllaLink cable to support R&E collaborations between Europe and Latin America.

Philippe Dumont, CEO of EllaLink said “In a time of continued environmental change, critical information about the planet can be ascertained from the seabed. Submarine telecoms cables are best placed to monitor seabed conditions at all time and make such data available to scientists on-land. We are proud to lead the way into a new era of submarine cable systems supporting such scientific progress.”

Erik Huizer, CEO of GÉANT commented “GÉANT provides users with highly reliable, unconstrained access to computing, analysis, storage, applications and other resources, to ensure that Europe remains at the forefront of research.  EllaLink will provide direct connectivity between the research and education communities of Europe and Latin America, thanks to the work of the BELLA Consortium of which GÉANT is a member. GÉANT therefore welcomes the development of a dark fibre research infrastructure that can support DAS and other technologies, without disturbing telecommunications traffic, as a further engagement from EllaLink for the R&E community.”

https://ella.link/category/press-releases/

New Atlantic Data Center Hub planned in Portugal

The EllaLink Group and aicep Global Parques – Gestão de Áreas Empresariais e Serviços, unveiled plans for a new "Sines Tech – Innovation & Data Center Hub" in Portugal.

The new campus is to be built in the Portuguese port city of Sines, in proximity to the landing station for the new Ellalink subsea cable to Latin America.

Diego Matas, Chief Operating Officer of EllaLink, added “I am delighted to announce our collaboration with Global Parks in promoting Sines as a new Atlantic hub addressing the demand for diverse data center connectivity and an alternative cable landing site in Portugal. EllaLink evaluated multiple landing locations during the project development phase and Sines was the optimum fit. Sines Tech will provide an environmentally friendly integrated subsea and terrestrial solution for all our customers and partners alike, supporting EllaLink’s open access and carrier neutral philosophy.”

https://ella.link/2019/10/23/global-parks-and-ellalink-partner-to-launch-sines-tech-hub-a-next-generation-innovation-and-data-center-hub-in-portugal/

EllaLink and Telxius collaborate on Brazil-Portugal subsea cable

The EllaLink Group and Telxius signed a collaboration agreement for international subsea capacity and terrestrial connectivity in Latin America, including cable landing facilities in Fortaleza, Brazil.

The complementary infrastructure owned by EllaLink and Telxius will enable European traffic to reach Rio de Janeiro, São Paulo and other key cities in Brazil and across Latin America.

EllaLink is an open state-of-the-art 4 fiber pair submarine cable system currently under construction. It will provide the first direct fiber route between Europe and Latin America.  The

Rafael Arranz, Chief Operating Officer of Telxius for its Cable Business, said: “We are proud to closely work with EllaLink on this project, which will further advance communications between Europe and Latin America. This collaboration will leverage on the extensive Telxius’ subsea cable network and its terrestrial extensions across Latin America. In particular, Telxius’ Fortaleza cable landing station interconnects subsea cables stretching towards three continents: America (Central and North), Africa and Europe (with EllaLink). Telxius’ BRUSA, with its 138 Tbps, is currently the highest capacity and lowest latency subsea cable connecting the Americas, potentially extending EllaLink’s reach and ability to serve their customers even further.”

Diego Matas, Chief Operating Officer of EllaLink, added: “I am delighted to announce our collaboration with Telxius which supports EllaLink’s primary objective of providing advanced products and services on a carrier neutral and open access basis. The Telxius facility in Fortaleza provides the ideal landing solution for a next generation subsea system like EllaLink, while strengthening Telxius’ transatlantic route diversity.”

https://telxius.com/en/ellalink-and-telxius-collaborate-to-bring-next-generation-connectivity-to-latin-america-and-europe/

EllaLink begins Marine Route Survey for Brazil-Portugal cable

Alcatel Submarine Networks has finalized the Cable Route Study and mobilized the marine survey vessel for the EllaLink submarine cable system. A marine route survey will be conducted over the coming months.

EllaLink will be a state-of-the-art 4 fiber pair submarine cable system linking Europe and Latin America with up to 72 Tbps of capacity. The low latency EllaLink route avoids the congestion of the North Atlantic.

EllaLink plans to be Ready for Service by the end of 2020.

https://ella.link/2019/05/06/ellalink-announces-commencement-of-marine-route-survey-activities/