Wednesday, October 10, 2007

Huawei Joins LTE/SAE Trial Initiative

Huawei Technologies has joined the Long Term Evolution / System Architecture Evolution (LTE / SAE) Trial Initiative ( LSTI ) and will hold the infrastructure vendor seat of the 2008 LTE/SAE Trial Initiative Steering Board.



Huawei said its participation in LSTI reflects commitment to contributing significantly to the development of HSPA, HSPA+ and LTE technologies, as a leading global telecommunication solutions supplier.



Huawei anticipates that it will launch commercial LTE products, based on multi-standard base stations, in 2009. http://www.huawei.com

  • In May 2007, a group of world leading telecom technology manufacturers and network operators comprised of Alcatel-Lucent, Ericsson, France Telecom/Orange, Nokia, Nokia Siemens Networks, Nortel, T-Mobile, and Vodafone, launched a joint initiative aimed at driving high performance mobile broadband networks based on 3GPP Release 8 "Long Term Evolution / System Architecture Evolution" (LTE/SAE) specifications.



    The LTE/SAE Trial Initiative targets mobile broadband peak data rates exceeding 100 Mbps. In line with 3GPP requirements, LTE/SAE aims to provide a mobile broadband service that outperforms both 3GPP Release 6 HSPA, as well as current fixed line DSL data rates while maintaining and extending the highly successful mobility and coverage benefits of 3GPP networks such as GSM.



    3GPP LTE/SAE networks are expected to enable lower operating costs for operators as well as higher data-rate, lower latency end-user services, and an improved end-user wireless mobility experience.



    LTE radio systems are designed to provide both greater levels of radio spectrum efficiency through use of new radio transmission schemes and advanced multi-antenna technologies, and a more flexible utilization of radio spectrum through support of carrier bandwidths ranging from 1.25 MHz to 20 MHz (subject to 3GPP ratification).



    The companies are planning a series of joint tests including radio transmission performance tests, early interoperability tests, field tests and full customer trials. Joint activities will commence in May2007, and are expected to run for a period of 18-24 months. Commercial deployments are expected in the 2009/2010 timeframe.