Showing posts with label Marea. Show all posts
Showing posts with label Marea. Show all posts

Thursday, January 28, 2021

Telia Carrier opens POP near MAREA’s cable landing station in Bilbao

Telia Carrier launched a new Point-of-Presence at Telxius’ interconnection rich Derio Communications Hub located near Bilbao, Spain, only a few kilometers from MAREA’s submarine cable landing station.

The Derio Communications Hub is a  combination of an expanded cable landing station and a fully-fledged PoP, the first of its kind in EMEA.  The 2,000 sqm carrier-neutral TIER III facility offers up to 4 MW of power and is specially designed to leverage the full potential of MAREA. It features an open architecture, offering high interconnection capacity as well as IP, Capacity, Colocation and Security services. It was designed using environmentally friendly standards and runs on 100 percent renewable energy with free cooling.

Telia Carrier said the new facility enhances its fiber connectivity for customers seeking gateway access to a completely new and diverse path from the Americas to Europe with low latency and high capacity between the two continents. Customers in the region can now take advantage of Telia Carrier’s number one ranked global backbone, AS1299, as well as the local availability of high-speed IP Transit, Cloud Connect, DDoS Mitigation, Ethernet and Internet Exchange (IX) Connect for operators, content providers and enterprises alike. The new expansion seamlessly connects to Telia Carrier’s terabit scale DWDM networks extending throughout Europe and the Americas.

“We see this as a very strategic route that complements Telia Carrier’s number one global backbone,” said Art Kazmierczak, Director of Business and Network Development, Telia Carrier. “By bringing our two networks together, we are creating a fully integrated carrier-class route that can handle capacity at scale to drive new edge activities in the region while supporting customers from international and local markets seeking to diversify their network and reduce latency.”

“The combination of Telia Carrier’s extensive global network and our Derio Communications Hub is a win-win for the world’s largest operators, content providers and enterprises,” said Enrique Valdés, Sales VP Northern Region, Telxius Cable. “Colocating in Derio opens up a world of interconnection opportunities with the US via MAREA and with the main European hubs. We believe this will benefit large and small customers looking for flexible and innovative solutions that will adapt to the future demand of data services.”

  • MAREA, which means “tide” in Spanish, is one of the highest capacity transatlantic submarine cables to date. It connects Virginia Beach in the US, with Sopelana, in Northern Spain, providing an alternative path to the main communication hub routes to Africa, the Middle East and Asia. 


Showing posts sorted by date for query MareaSort by relevance Show all posts

Facebook tests trans-Atlantic 700 Gbps wavelength with Infinera's ICE6

 Facebook achieved two significant optical transmission records during recent testing of Infinera's ICE6 optical engine over the MAREA trans-Atlantic cable system:MAREA hero results over 6,640 km30 Tbps of total capacity on a single fiber pair700 Gbps data rate per wavelengthMAREA deployable results over 6,640 km:28 Tbps of total capacity on a single fiber pairUp to 650 Gbps data rate per wavelengthThe hero result is considered maximum performance...

Windstream Wholesale moves into Globalinx in Virginia Beach

Windstream Wholesale is the first national service provider built into the Globalinx Data Center international subsea cable landing station in Virginia Beach, Virginia. Windstream Wholesale is taking orders out of the new Globalinx Data Center. Windstream Wholesale has secured a contract with anchor tenant Hurricane Electric for multiple 100G circuits connecting into the Globalinx location. The access point also provides another location for carrier,...

NJFX and Telxius interconnect their East Coast Cable Landing Stations

The NJFX Cable Landing Station (CLS) in Wall, New Jersey has been directly connected to Telxius facilities at the CLS in Virginia Beach, VA using Windstream's fiber network. NJFX’s CLS campus offers access to four subsea cable systems to Europe and South America and seven independent US fiber-based backhaul providers. Customers can access points of presence in 15 countries across Central and South America, Mexico and the Caribbean. NJFX said its...

Tuesday, September 24, 2019

Cisco's NCS 1004 platform tested over MAREA subsea cable

Cisco's NCS 1004 platform was successfully tested over MAREA, the 6,600 km subsea cable system connecting the United States to southern Europe (Virginia Beach, Virginia to Bilbao, Spain).

Several channel capacity combinations were tested to maximize the performance and spectral efficiency on the cable. For the Virginia to Bilbao trial, 400G error-free performance was demonstrated; channels with record spectral efficiency of 6.445 b/s/Hz were achieved, while 4.52b/s/Hz spectral efficiency was tested on the looped back scenario of over 13,200km.

Cisco also said the test simulated transpacific distances via loopback on one end of the cable.

“We demonstrated that 24.7Tbps could be used on MAREA with plenty of margin. We also tested in full loopback mode (Bilbao to Virginia and back to Bilbao) showing that 18.5Tbps could be deployed for double the distance, also with plenty of system margin,” said Bill Gartner, Senior Vice President and General Manager, Optical Systems and Optics, Cisco.

https://newsroom.cisco.com/press-release-content?type=webcontent&articleId=2020401